EICR Compliance Checklist

Electrical Installation Condition Report — landlord obligations and compliance checklist

Landlord Handbook
Updated 1 May 2026
England & Wales
Annual Access

Legal Requirement

Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, landlords must have the electrical installation inspected and tested at least every 5 years by a qualified electrician. Failure to comply can result in fines of up to£30,000.

What Is an EICR?

An Electrical Installation Condition Report (EICR) is a formal document produced by a qualified electrician after inspecting and testing the fixed electrical installation in a property. It assesses whether the installation is safe and identifies any defects, deterioration, or non-compliance with current standards.

EICR Outcome Codes

  • C1 — Danger present: Risk of injury. Immediate remedial action required. The property must not be let until the C1 is resolved.
  • C2 — Potentially dangerous: Urgent remedial action required within 28 days of the report.
  • C3 — Improvement recommended: Not a failure — improvement is advisable but not mandatory. The EICR is still satisfactory.
  • FI — Further investigation required: Further investigation needed without delay.

An EICR is satisfactory only if it contains no C1, C2, or FI codes.

Landlord Obligations Checklist

  • Obtain an EICR from a qualified and competent electrician at least every 5 years (or more frequently if the report specifies)
  • Ensure the EICR is satisfactory (no C1, C2, or FI codes) before the tenancy starts or continues
  • Provide a copy of the EICR to existing tenants within 28 days of the inspection
  • Provide a copy to new tenants before or on the day the tenancy starts
  • Provide a copy to prospective tenants within 28 days of a written request
  • Provide a copy to the local housing authority within 7 days of a written request
  • If the EICR is unsatisfactory (C1 or C2), carry out all remedial work within 28 days (or sooner if specified)
  • Obtain written confirmation from the electrician that remedial work has been completed satisfactorily
  • Provide the written confirmation to tenants and the local authority within 28 days of the remedial work being completed
  • Retain copies of all EICRs and remedial work confirmations

EICR Record Log

  • Property address: _________________________
  • EICR date: __________ Electrician: _________________________ Outcome: Satisfactory / Unsatisfactory
  • Any C1/C2 codes: Yes / No — Remedial work completed: __________ Confirmation given to tenant: __________
  • Next EICR due: __________

Penalties for Non-Compliance

  • Local housing authority can impose a financial penalty of up to £30,000
  • Local authority can arrange remedial works and recover costs from the landlord
  • Failure to provide the EICR to a tenant is a breach of the regulations

Useful Resources

  • NICEIC (find a qualified electrician): niceic.com
  • NAPIT: napit.org.uk
  • Government guidance: gov.uk/guidance/electrical-safety-standards-in-the-private-rented-sector

Disclaimer

Guidance only. Landlord Handbook provides practical information to help landlords understand their responsibilities. It is not legal or financial advice. Always check the latest GOV.UK guidance and seek professional advice where appropriate.

Landlord Handbook
Expert UK Landlord Guidance
www.landlordhandbook.co.uk
© 2026 Landlord Handbook. All rights reserved.
This document is the intellectual property of Landlord Handbook. Reproduction for commercial purposes is prohibited without written consent.