Maintenance Request Log Template

Landlord Handbook
www.landlordhandbook.co.uk
Template
Ref: LH-TM-MR-001
Last updated: 1 May 2026
Printed: 8 October 2026

Maintenance Request Log

Structured log for tracking all maintenance and repair requests from tenants — from report through to completion

Landlord Handbook
Updated 1 May 2026
England & Wales
Annual Access

Why Track Maintenance Requests?

A maintenance log demonstrates that you respond promptly to repair requests — which is a legal obligation under the Landlord and Tenant Act 1985 and the Homes (Fitness for Human Habitation) Act 2018. It also provides evidence in any disrepair claim or deposit dispute, and helps you manage contractor relationships and costs.

Property Details

  • Property address: [Address]
  • Tenant name(s): [Names]
  • Tenancy start date: [Date]

Log Entry Format

Complete one entry per maintenance request. Update the entry as the repair progresses through to completion.

Request Reference

  • Ref number: [MR-001, MR-002, etc.]
  • Date reported: [Date]
  • Reported by: [Tenant / Agent / Inspection]
  • Method of report: [Email / Phone / Text / In person]
  • Description of issue: [Full description of the problem reported]
  • Location in property: [Room / area]
  • Priority: [Emergency / Urgent / Routine]

Priority Definitions

  • Emergency: Immediate risk to health, safety or security — respond within 24 hours. Examples: gas leak, total loss of heating in winter, burst pipe, broken external door lock.
  • Urgent: Significant impact on habitability — respond within 3–5 working days. Examples: partial loss of heating, boiler fault, blocked drain.
  • Routine: Minor repairs, cosmetic issues — respond within 28 days. Examples: dripping tap, broken light fitting, minor plaster damage.

Landlord Response

  • Date acknowledged to tenant: [Date]
  • Acknowledgement method: [Email / Phone / Text]
  • Initial assessment: [Landlord responsibility / Tenant responsibility / Investigate further]
  • Contractor instructed: [Yes / No]
  • Contractor name: [Name]
  • Date contractor instructed: [Date]
  • Estimated completion date: [Date]

Access Arrangements

  • Access notice given to tenant: [Date — minimum 24 hours notice required]
  • Agreed access date and time: [Date and time]
  • Tenant confirmed access: [Yes / No]

Completion

  • Date repair completed: [Date]
  • Work carried out: [Description of work done]
  • Contractor invoice reference: [Reference]
  • Cost: £[Amount]
  • Tenant notified of completion: [Yes / Date]
  • Tenant confirmed satisfactory: [Yes / No / Not confirmed]
  • Follow-up required: [Yes / No — if yes, details]
  • Status: [Complete / Pending / Awaiting parts / Awaiting access]

Sample Entry

  • Ref: MR-001
  • Date reported: [Date]
  • Issue: Boiler not producing hot water — tenant reports no hot water since yesterday morning
  • Priority: Urgent
  • Acknowledged: [Date] by email
  • Contractor: [Plumber name] instructed [date]
  • Access agreed: [Date and time]
  • Completed: [Date] — faulty diverter valve replaced
  • Cost: £[Amount] — invoice ref [reference]
  • Status: Complete

Legal Note: Under Section 11 of the Landlord and Tenant Act 1985, landlords must keep the structure, exterior and installations in repair. The Homes (Fitness for Human Habitation) Act 2018 requires properties to be fit for human habitation throughout the tenancy. Failure to respond to repair requests within a reasonable time can result in a disrepair claim, rent repayment order, or improvement notice from the local authority.

Disclaimer

Guidance only. Landlord Handbook provides practical information to help landlords understand their responsibilities. It is not legal or financial advice. Always check the latest GOV.UK guidance and seek professional advice where appropriate.

Landlord Handbook
Expert UK Landlord Guidance
www.landlordhandbook.co.uk
© 2026 Landlord Handbook. All rights reserved.
This document is the intellectual property of Landlord Handbook. Reproduction for commercial purposes is prohibited without written consent.